Separate lines look simple on paper, but they usually lock you into fixed capacity that rarely matches real demand. Each dedicated line needs its own footprint, fixtures, tools, support space, material staging, and often its own staffing plan. When demand for one model drops, that line becomes underutilized while another line may be overloaded—so you end up carrying extra labor, expediting, overtime, and inventory to “cover the gaps.” A mixed model line is designed to absorb demand changes by adjusting the sequence and pacing, not by building big batches. When models share common processes, the same people and equipment can produce a broader range of products with less total capacity. Done correctly, mixing models also reduces lead time because you can build closer to the customer’s order pattern, which helps stabilize shipping performance and lowers finished goods inventory. The tradeoff is that you must design work content, material presentation, and problem response discipline to prevent chaos.
-
This topic was modified 10 months ago by
LDS Admin.