ZigaForm version 7.0.2

FAQ: What worksheets (tabs) are required in the Excel data file?

Lean Design Studio Landing Page › Forums › Simulation Forum › FAQ: What worksheets (tabs) are required in the Excel data file?

Viewing 0 reply threads
  • Author
    Posts
    • #64384
      LDS Admin
      Keymaster

      The Excel data workbook is built around **six required worksheets**, and the simulator is expecting them to exist as the backbone of the model. Those tabs represent the six input “tables”: **Flow Description (FlowDesc), Resources, Flow, Products, Process Time (ProcessTimes), and Sequence**. In practical terms, FlowDesc defines your flow codes, Resources defines stations/people/secondary resources and buffers, Flow defines the routing logic, Products assigns each product to a flow (and subassemblies if used), ProcessTimes provides the time overrides by product and station, and Sequence defines the order quantities and build order. You *can* add extra worksheets for notes or alternate scenarios, but the engine will ignore them unless you rename them to the required tab names.

      • This topic was modified 9 months, 4 weeks ago by LDS Admin.
Viewing 0 reply threads
  • You must be logged in to reply to this topic.
Scroll to Top