Work content is the total amount of labor time required to build one unit, based on the defined method. It includes the hands-on assembly steps, inspections, handling, and any necessary walking or reaching that is part of the job as currently designed. In mixed model environments, work content often varies by model, which is why it must be understood at both the individual model level and at the weighted average for the planned mix. Work content is not the same as lead time; it is the sum of the task times that people must perform. Knowing work content lets you calculate how many operators are needed at a given takt, identify where imbalance will occur, and see whether variation between models will create overloads. It is one of the core inputs for staffing, line design, and improvement planning.
-