The simulator is designed as a stochastic environment, meaning it can introduce randomness so the model behaves more like real operations rather than a perfectly repeatable, deterministic line. Variability is assigned at the resource level in the Resources worksheet using NONE, LOW, MEDIUM, or HIGH; secondary resources and operators inherit variability from the associated primary resource. Whether that variability is actually applied during a run depends on the Use Variable Times option in the control panel: if it is unchecked, the simulator overrides resource variability to NONE; if checked, it uses the variability settings in the workbook. Because randomness is involved, two runs can produce slightly different outputs, so longer run times generally yield more reliable averages.