ZigaForm version 7.0.2

FAQ: Where do ProcessTimes come from?

Lean Design Studio Landing Page › Forums › Simulation Forum › FAQ: Where do ProcessTimes come from?

Viewing 0 reply threads
  • Author
    Posts
    • #64444
      LDS Admin
      Keymaster

      ProcessTimes come from whatever source best represents the actual work content at the part-and-station level: time studies and standard work, machine cycle-time data, engineering estimates, or validated historical performance. In the workbook, ProcessTimes lets you override defaults by entering Machine Time and Labor Time for a specific part code at a specific primary station; if you do not provide a record for that part/station, the simulator falls back to the default times you entered in the Flow table. Machine and labor times are additive (not overlapping), and you can use minutes or seconds as long as your run time and warm-up time use the same unit.

      If you do not have detailed distributions, using averages is acceptable as a starting point. For realism, apply resource-level variability (LOW/MEDIUM/HIGH) and enable variable times so the simulator randomizes around your base times rather than treating every cycle as perfectly repeatable.

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
Scroll to Top