ZigaForm version 7.0.2

FAQ: What is an IPK/buffer in the simulator?

Lean Design Studio Landing Page › Forums › Simulation Forum › FAQ: What is an IPK/buffer in the simulator?

Viewing 0 reply threads
  • Author
    Posts
    • #64442
      LDS Admin
      Keymaster

      An IPK (in-process kanban) is a modeled buffer location that sits immediately after a primary station and can hold a defined number of parts, which helps represent limited downstream space and prevents unrealistic “infinite” accumulation. In the Resources worksheet you specify the number of IPKs (buffer capacity) after a station; the simulator creates those IPK locations during runtime. You can also include travel time from the station to its IPK using the Travel Time to IPK field, which is valid only for primary resources. Then, in the Flow worksheet, you model the movement to the next station using the Travel Time (from IPK to Next Process) field; if the station has an IPK, that travel time is measured from the IPK, otherwise it is measured directly from the station.

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
Scroll to Top