      A bottleneck is the point in the process that most limits overall throughput. It may be a single station, a machine, a test step, or even a shared resource that multiple products compete for. The bottleneck sets the pace for the entire value stream because work upstream will eventually queue in front of it, and work downstream will eventually starve without it. This is why “local improvements” can be disappointing: you can speed up non-bottleneck areas and still see no meaningful increase in output, because the constraint has not moved. In mixed model production, the bottleneck can shift by model—one variant may be constrained by assembly time, another by a long curing cycle or test duration—so the team must look carefully at the planned mix and the sequence. Managing the bottleneck is central to meeting takt and stabilizing daily performance.

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
Scroll to Top