FAQ: What are “Resources,” and how do they work?

Lean Design Studio Landing Page › Forums › Simulation Forum › FAQ: What are “Resources,” and how do they work?

Viewing 0 reply threads
  • Author
    Posts
    • #64427
      LDS Admin
      Keymaster

      Units specifies how many identical copies of a resource exist; the simulator generates separate resources for each unit (for example, AGV, AGV.1, AGV.2) at run time. Use Units when you have true parallel equipment or people—multiple identical machines, carts, AGVs, or operators that can be assigned independently. Capacity is different: it is the number of parts a single Primary location can hold and process simultaneously, which is ideal for multi-slot fixtures, ovens, wash racks, or curing areas. Increasing Capacity mainly affects blocking and queueing behavior at that station. If you set a very large Capacity on a Primary resource, it can represent storage; if you want that storage to be effectively permanent, use a high processing time in ProcessTimes, otherwise the large Capacity behaves like an IPK/buffer downstream.

      • This topic was modified 10 months, 1 week ago by LDS Admin.
Viewing 0 reply threads
  • You must be logged in to reply to this topic.
Scroll to Top