ZigaForm version 7.0.2

FAQ: How do I reduce expedites?

Lean Design Studio Landing Page › Forums › Mixed Model Material Flow › FAQ: How do I reduce expedites?

Viewing 0 reply threads
  • Author
    Posts
    • #64491
      LDS Admin
      Keymaster

      Expediting is usually a symptom of weak standards and unclear replenishment ownership, not simply “bad planning.” Start by identifying which parts generate the most expedites and classify them by cause: wrong min/max, packaging quantity changes, location drift, supplier reliability, or sequence volatility. Then stabilize the core loop. Ensure PFEP is current, signals are visible, and route work is standardized so replenishment happens before stockouts occur. Reduce special trips by tightening route intervals for the critical parts or by moving them to a more accessible supermarket location. For option parts, use kitting or unit-based staging so demand is explicit rather than guessed. Finally, make expedites measurable: track them daily, review root causes weekly, and treat each expedite as a process failure with a corrective action. When the loop is designed and managed, expediting becomes rare and informative.

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
Scroll to Top