ZigaForm version 7.0.2

FAQ: How do I model feeder processes versus the mainline process?

Lean Design Studio Landing Page › Forums › Simulation Forum › FAQ: How do I model feeder processes versus the mainline process?

Viewing 0 reply threads
  • Author
    Posts
    • #64440
      LDS Admin
      Keymaster

      To model feeder processes, you treat the mainline and each feeder/subassembly as separate flows. In FlowDesc, create a distinct flow code for the main flow and a different flow code for every feeder/subassembly you want to simulate. Each subassembly must also have its own product code in Products, be assigned its own Flow code, and be linked to the end-item using the SUB1…SUBn columns. In the subassembly routing on the Flow sheet, flag the final step as “assembled in next process” and set the Next Location to the downstream consuming station in the main flow so the end-item can be forced to wait if the subassembly is not ready. The simulator supports only one subassembly level, so subassemblies cannot consume other subassemblies.

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
Scroll to Top