FAQ: How do I model changeover time or setup losses?

Lean Design Studio Landing Page › Forums › Simulation Forum › FAQ: How do I model changeover time or setup losses?

Viewing 0 reply threads
  • Author
    Posts
    • #64448
      LDS Admin
      Keymaster

      The workbook does not provide a dedicated “changeover time” field, so setup losses are typically modeled by adding time at the station where the setup occurs. The most direct approach is to override the station’s default times by adding a ProcessTimes record for the specific part code and station, increasing machine time and/or labor time to include the setup component for that product at that resource. If no ProcessTimes record exists, the simulator uses the default times from the Flow table, so ProcessTimes is the right place when setup is product-specific. If you want to reflect running products in campaigns to reduce changeovers, you can enforce grouping using Batch Size at the resource, or use the AutoSequencer’s Min Qty to force back-to-back runs while still producing one unit at a time.

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
Scroll to Top