ZigaForm version 7.0.2

FAQ: How do I define the build mix and demand volume for a run?

Lean Design Studio Landing Page › Forums › Simulation Forum › FAQ: How do I define the build mix and demand volume for a run?

Viewing 0 reply threads
  • Author
    Posts
    • #64446
      LDS Admin
      Keymaster

      You define build mix and demand volume through the Sequence worksheet, which is the order list the simulator actually runs. Each row specifies an end-item Product code and a Units quantity; the engine creates one entity per unit and releases them in that listed order (subassemblies are not sequenced directly). The model will run until it reaches warm-up time plus run time, or until it consumes all orders in Sequence—so if your total Units do not cover the simulated time window, the run ends early and you will see a warning. If you want a fast way to generate a realistic mixed-model sequence, the optional SeqData worksheet can be used with the AutoSequencer macros, where Demand can reflect FDV (forecast daily volume) or an actual production plan, and the macro populates Sequence accordingly.

Viewing 0 reply threads
  • You must be logged in to reply to this topic.
Scroll to Top