Powered by ZigaForm version 4.2
STAGE 0: Introduction to the Program
STAGE 1: STANDARDIZE
STAGE 2: TRANSFORM
STAGE 3: REFINE
STAGE 4: ENGINEER
STAGE 5: AWAKEN
STAGE 6: MAINTAIN

12 Line Performance Audit [RISE]

12 – Conduct and Audit with the goal of assessing the line’s fitness with respect to the stated goals. Once the new line has “settled in”, revisit the assessment documentation, the line design guidelines, and the line design acceptance criteria to compare against the line’s current performance.